During early January of 2022, a systematic plan was assembled to construct a telluric testing stage at EPD Laboratories in Tonopah Nevada, in which the objective was to employ two specially constructed 160 meter transmitting and receiving coils for this very operation. I had the ability to venture upon their construction, and have included a detailed engineering report of the coil(s) performance, in the form of a free downloadable pdf. These plans and engineering data may be used for anyone willing to experiment with shortwave frequency telluric communication.

Pictorial slideshow-video produced by team member Aaron Murakami showing development at Tonopah.

Recommended Posts